All projects

Elm Street Bath

Project

Bathroom

Location

Oil City

Timeline

5 weeks

Completed

August 2026

The finished Hilltop kitchen

A cramped primary bath with a tub nobody used and a step-in shower that leaked into the kitchen ceiling. The owners wanted one big shower they could walk into for the next thirty years.

We pulled the tub, sistered the joists the leak had softened, and built a curbless shower with a linear drain and a bench. Large-format porcelain runs floor to ceiling, with heated floors, a 60-inch double vanity, and blocking in every wall for grab bars later.

Start a Project Like This

Before and after.

Hover or tap the photo

The kitchen before the remodelThe kitchen after the remodel

Before / After

No items found.

“They found the rot on day two, showed us, priced the fix before touching it, and still finished the week they promised.”

Linda R.